Wild Spaces & Public Places Completed Projects

Alachua County voters have approved three iterations of the Wild Spaces & Public Places (WSPP) program: the first from 2009-2010, the second from 2017-2023, and the most current iteration from 2023-2032. For the latest round of the program, the City of Gainesville receives about 35.35% of the collected sales tax revenue to utilize on improvements to existing parks along with new signature park projects within the city boundaries. 

Please see below for a list of projects made possible with surtax revenue through the Wild Spaces & Public Places program. Within each project dropdown box, you can find work descriptions, project costs, photo albums and videos.  

2026

NE 31st Avenue Multipurpose Trail (NE 15th Street to NE Waldo Road)

Project Description:

The project consisted of a 10-foot-wide asphalt multiuse trail along the north side NE 31st Avenue from NE 15th Street to NE Waldo Road. Construction began in October and completed in June 2026. R.E. Arnold Construction, Inc. was awarded the contract for these improvements through a competitive bidding process for a total of $1,499,900.

Cost: 

$1,499,900

Consultant/Contractor:

R.E. Arnold Construction, Inc. 

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

City Hall Plaza Renovation

Project Description: 

This project consisted of the replacement of the aging 1960s-era ponds with a modern and flexible public plaza featuring new green spaces, seating, landscaping and improved lighting. This project also included enhancements to the Martin Luther King Jr. Memorial Garden and Sister Cities Monument Garden. 

Construction of the improved City Hall Plaza began in October 2025 and wrapped up in April 2026 with an official ribbon cutting ceremony held in May 2026. The project was partially funded by Wild Spaces & Public Places (WSPP), covering a little more than one-third of the total cost. Specifically, WSPP's portion was $717,983.38 out of the $1,833,920.38 total construction cost. 

Cost:

$717,938.38 (WSPP portion)

Consultant/Contractor: 

Scherer Construction

Contact: 

Phil Mann, Project Manager
352-393-8603
mannpr@gainesvillefl.gov

Tom Petty Park Improvements

Project Description:

This project consisted of a series of improvements to Tom Petty Park, located at 51 NE 16th Ave. The improvements included the addition of eight dedicated pickleball courts, new seating areas, parking lot lighting, a new restroom, a concessions and storage building and a pedestrian entrance from the NE 16th Ave. crosswalk to Tom Petty Park. The park also features new landscaping, a stormwater pond and a Bee City Gainesville pollinator garden. Additionally, the project rerouted the existing multipurpose trail to enhance ADA accessibility and improve landscaping and stormwater management onsite.

D.E. Scorpio Corporation was awarded the contract for the pickleball improvements through a competitive bidding process for a total of $1,967,007. The new restroom, concessions and storage building will be constructed by D.E. Scorpio Corporation at a cost of $718,300. 

Cost:

$2.6 million

Consultant/Contractor:

D.E. Scorpio Corporation

Contact:

Rachel Mandell, Project Manager
352-393-8544
mandellrc@gainesvillefl.gov

Additional Information: 

For more detailed information about the Tom Petty Park Improvements project, please visit the webpage below. This page includes public meeting information including an archive of past meeting notices, minutes, presentations, handouts and ongoing project updates.

View Project Page

 

2025

Morningside Nature Center Farm Area Upgrades

Project Description: 

This project consisted of upgrades at Morningside Nature Center's Living History Farm located at 3540 E. University Avenue. The  improvements included the installation of new livestock pens, lean-to structures, a new grazing area and utility upgrades. Construction began in June 2025 and completed in November 2025. ESB Light, LLC performed the work at a cost of $137,000. 

Cost:

$137,000.00

Consultant/Contractor:

ESB Light, LLC

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

The Hippodrome Theatre Historic Elevator Repair

Project Description:

This project consisted of the renovation of the historic elevator at the Hippodrome Theatre — a historic building that previously served as a post office and a federal courthouse — located at 25 SE 2nd Place. The improvements included motor refurbishment, rewinding of the hoist motor, reconditioning of the hoist motor, brushes and overall rebuilding. Eletech Elevator Company performed the work at a cost of $135,799.00 and construction spanned from February 2025 to August 2025. 

Cost: 

$135,799.00

Consultant/Contractor:

Eletech Elevator Company

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

The Hippodrome Theatre Awning Repair

Project Description:

This project consisted of the renovation of the historic awning on the southeast corner of the Hippodrome Theatre, a historic building that previously served as a post office and a federal courthouse — located at 25 SE 2nd Place. The improvements included removal of the roof membrane to expose damaged decking, removal and replacement of damaged plywood decking and framing lumber, installation of a new modified torch base sheet and cap sheet tied into the existing roof, installation of TREMCO base coat and embedded fabric on all seams and installation of TREMCO topcoat on the entire roof. Joyner Construction Partners, LLC performed the work for a cost of $22,113.00.

Cost:

$22,113.00

Consultant/Contractor:

Joyner Construction Partners, LLC

Contact

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Ironwood Golf Course Irrigation Controls Upgrade

Project Description:

This project consisted of the replacement of the irrigation controls, pump and motor at Ironwood Golf Course, located at 2100 NE 39th Avenue. ProPump & Controls Inc. completed the work at a cost of $187,029.90 and construction spanned from July 2025 to August 2025. 

Cost:

$187,029.90

Consultant/Contractor:

ProPump & Controls Inc.

Contact:

Rachel Mandell, Project Manager
352-393-8544
mandellrc@gainesvillefl.gov

Fred Cone Park Track Resurfacing and Infield Repair

Project Description:

This project consisted of the resurfacing of the track as well as repair and reseeding of the infield at Fred Cone Park located at 2801 E. University Ave. While American Athletic Track & Turk resurfaced the track, Urban Greenscapes, LLC repaired the infield. The contractors began work in March 2025 and completed in June 2025 for a combined project cost of $319,494.19.  

Cost:

$319,494.19 (combined cost for track and infield)

Consultant/Contractor:

American Athletic Track & Turf; Urban Greenscapes, LLC

Contact:

Rachel Mandell, Project Manager
352-393-8544
mandellrc@gainesvillefl.gov

ADA Improvements: T.B. McPherson Recreation Complex and Hogtown Creek Headwaters Nature Park

Project Description:

This project consisted of the construction of sidewalk improvements at T.B. McPherson Recreation Complex, located at 1717 SE 15th St., and at Hogtown Creek Headwaters Nature Center, located at 1500 NW 45th Ave. Construction Genes, LLC facilitated both projects with respective construction project costs of $14,922 and $11,696. Completed in April 2025, these projects included the replacement of broken sidewalk and concrete grinding to improve universal park access.

Cost: 

T.B. McPherson Recreation Complex: $14,922

Hogtown Creek Headwaters Nature Center: $11,696

Consultant/Contractor:

Construction Genes, LLC

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Boulware Springs Basin Sediment Removal

Project Description:

This project consisted of the dredging of the Boulware Springs basins adjacent to the historic Boulware Water Works Building located at 3300 SE 15th St. Through a competitive procurement process, SE Diving, LLC was awarded a construction contract and performed the dredging work from February 2025 to April 2025 for a cost of $87,500. 

Cost:

$87,500

Consultant/Contractor:

SE Diving, LLC

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Multiuse Trail Signage

Project Description:

This project consists of the installation of 37 wayfinding and informational signs along the City of Gainesville's network of multiuse paths. The signage set features a range of sign types color-coded by trail: 

  • Mile Zero Trail Map: Situated at the corner of SW Sixth St. and Depot Ave., the Mile Zero Trail Map charts trails, city parks and offers etiquette guidelines for trail use. 
  • Directional Signs: Signs indicate the distance to upcoming points of interest. 
  • Vicinity Maps: Maps at strategic points along the trails show nearby points of interest, connecting trails and etiquette guidelines for trail use. 
  • Mile Markers: Signs indicate the distance from the mile zero marker.

Department of Transportation staff collaborated with the Bicycle Pedestrian Advisory Board on the signage suite's design, content and trail etiquette guidelines. In-house Wild Spaces & Public Places staff designed the signs while Clear Image Signs, LLC, a local business was awarded the production and installation contract through a competitive procurement process. The installation lasted approximately one month from February 2025 to March 2025 for a total cost of $29,923.95.  

Cost: 

$29,923.95

Consultant/Contractor:

Clear Image Signs, LLC

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Kiwanis Challenge Park Track Improvements

Project Description:

This project consisted of the renovation of the track at Kiwanis Challenge Park located at 2002 NW 36th Ave. Additional improvements included the installation of concrete pads to house two ADA-compliant picnic tables and six benches. AKEA, Inc. performed the work from December 2024 to March 2025 for a project cost of $246,000. 

Cost: 

$246,000

Consultant/Contractor:

AKEA, Inc. 

Contact: 

Rachel Mandell, Project Manager
352-393-8544
mandellrc@gainesvillefl.gov

Hidden Gem Park Basketball Court Reconstruction

Project Description: 

This project consisted of the reconstruction of the basketball court and installation of new basketball court poles at Hidden Gem Park located at 3170 NW 20th St. Walker Concrete & Masonry, LLC performed the work from late December 2024 to March 2025 for a project cost of $25,103. 

Cost:

$25,103

Consultant/Contractor: 

Walker Concrete & Masonry, LLC

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Abby Wambach Park Restroom Renovation

Project Description: 

This project consisted of the renovation to restrooms at Abby Wambach Park located at 4501 SW 20th Ave. The renovated restroom design meets accessibility guidelines and includes the addition of new toilets, urinals, partitions, countertops, faucets, sinks, diaper changing stations and lighting. Exterior improvements included a new metal roof, skylights and gutters. TPF Construction Services, LLC performed the work from November 2024 to March 2025 for a project cost of $109,600.00. 

Cost:

$109,600.00

Consultant/Contractor:

TPF Construction Services, LLC

Contact:

Rachel Mandell, Project Manager
352-393-8544
mandellrc@gainesvillefl.gov

Alfred A. Ring Nature Park Boardwalk Improvements

Project Description: 

This project consisted of repairs to the boardwalk at Alfred A. Ring Nature Park, located at 1801 NW 23rd Blvd. The repairs began in November 2024 and wrapped up in February 2025. For ten sections of the boardwalk, the repairs included replacement of all walking surfaces and handrails. The project also involved the construction of new concrete ramps at the north trailhead bridge. MKM Quality Construction, Inc. performed the work for a project cost of $337,369.

Cost: 

$337,369

Consultant/Contractor:

MKM Quality Construction, Inc.

Contact: 

Rachel Mandell, Project Manager
352-393-8544
mandellrc@gainesvillefl.gov

Dwight H. Hunter Pool Slide

Project Description: 

This project consisted of the installation of a new pool slide at Dwight H. Hunter Pool, located at 1100 NE 14th St., beginning in May  2024 and completing in March 2025. Rain Drop Products, LLC performed the work for a project cost of $353,855.

Cost:

$353,855

Consultant/Contractor:

Rain Drop Products, LLC

Contact:

Rachel Mandell, Project Manager
352-393-8544
mandellrc@gainesvillefl.gov

Loblolly Woods Nature Park Boardwalk Hurricane Damage Repair

Project Description:

This project consisted of repairs to the boardwalk at Loblolly Woods Nature Park, located at 2710 NW 8th Ave., in the aftermath of damage sustained during Hurricane Helene and Hurricane Milton. These repairs took place in January 2025. Through a competitive procurement process, staff awarded TPF Construction Services, LLC the construction contract for a project cost of $10,100. 

Cost:

$10,100

Consultant/Contractor:

TPF Construction Services, LLC

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Duval Nature Park Improvements

Project Description:

This project consisted of renovations at Duval Nature Park, located at 610 NE 24th Street, spanning from February 2025 to June 2025. Enhancements ranged from ADA accessibility upgrades to new signage:  

  • An ADA walking trail around the existing stormwater pond at the eastern end of the park
  • A new pedestrian entrance
  • A new grill and water fountain
  • Stormwater improvements at the northwest corner of the park
  • A designated asphalt parking area, including bicycle parking, at the entrance on NE 24th Street
  • A new playground
  • New signage throughout the park

AKEA, Inc. was awarded a $237,000 contract through a competitive bidding process to complete ADA-acessible walking trail construction, pedestrian entrance and parking area improvements, stormwater enhancements, as well as the installation of a grill and water fountain. Kompan, Inc. received a $79,743 contract for the design and installation of the playground. Gaston's Tree Service provided site preparation services in the playground area, including underbrush clearing, canopy lifting, removal of three trees and debris removal, for a total cost of $4,825. Clear Image Signs produced and delivered new park signage for $1,302.

Cost: 

$322,870 (total)

Consultant/Contractor:

  • AKEA, Inc.
  • Kompan, Inc.
  • Gaston's Tree Service
  • Clear Image Signs, LLC

Contact:

Rachel Mandell, Project Manager
352-393-8544
mandellrc@gainesvillefl.gov

Lighting Improvements at 5 City Parks

Project Description:

This project consisted of lighting improvements to five different city parks from October 2023 to December 2025: 

  • Albert “Ray” Massey Park (1001 NW 34th St.)
    New lighting on the softball field, basketball courts, baseball fields 1 & 2 and upgrades to tennis court lighting
  • Greentree Park (3700 NW 19th St.)
    Upgraded lighting on the baseball fields
  • Fred Cone Park (2801 E. University Ave.)
    New lighting on the basketball courts and multipurpose field
  • Cora P. Roberson Park (600 SW 6th St.)
    Upgraded lighting on the basketball court
  • Tom Petty Park (501 NE 16th Ave.)
    Upgraded lighting on the softball fields and tennis courts
    New lighting for the multipurpose field

Musco Sports Lighting, LLC completed the work for a project cost of $2,579,550. 

Cost: 

$2,579,550

Contractor/Consultant:

Musco Sports Lighting, LLC

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

 

2024

Hippodrome Roof and Gutter Repair

Project Description:

This project consists of the construction of improvements to the Hippodrome Theatre's roof and gutter system that took place from August 2024 to September 2024. The work included the installation of replacement flashing around eight dormer windows and one chimney as well as the lining of the gutter system to prevent stormwater infiltration. Next Dimension Construction, LLC performed the work at a cost of $143,483.61.

Cost:

$143,483.61

Consultant/Contractor:

Next Dimension Construction, LLC

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Tom Petty Park Field #2 Drainage Improvements

Project Description:

This project consisted of the construction of drainage improvements to Field #2 at Tom Petty Park, located at 501 NE 16th Ave.  Florida Green Keepers, LLC performed the work for a cost of $23,650.

Cost:

$23,650

Consultant/Contractor:

Florida Green Keepers, LLC

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Split Rock Conservation Area Entrance Improvements

Project Description: 

This project consisted of the installment of bollards at the entrance to Split Rock Conservation Area, located at 6371 SW 20th Ave., to prevent unauthorized vehicular access to the site. The work took place in mid-August 2024. TPF Construction Services, LLC performed the work at a cost of $4,477.

Cost:

$4,477

Consultant/Contractor:

TPF Construction Services, LLC

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Split Rock Conservation Area Boardwalks

Project Description: 

This project consisted of the construction of pedestrian crossings over the wetlands within Split Rock Conservation Area, located at 6371 SW 20th Ave. The work began in March 2024 and completed in July 2024. The City of Gainesville's Natural Resources Division constructed the boardwalks with materials purchased through Wild Spaces & Public Places funds. The project cost was $43,800.79. 

Cost: 

$43,800.79

Consultant/Contractor:

The City of Gainesville's Natural Resources Division constructed the boardwalks with materials purchased through Wild Spaces & Public Places funds.

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Lincoln Yard Park

Project Description:

The project consisted of the construction of a new neighborhood park, located at 2099 SE 8th Ave. Construction began in Jan. 2024 and completed in July 2024. The new park included the creation of a one-third-mile trail, new decorative fencing around the stormwater pond and a landscaped entrance featuring wood rail fencing, entrance columns and decorative boulders. The park features a small playground, seating and adult fitness equipment. Joyner Construction Partners, LLC, a small local business, performed the work for a total construction cost of $369,733. 

Cost: 

$369,733

Consultant/Contractor:

Joyner Construction Partners, LLC

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

ADA Improvement Projects: Possum Creek Park, Fred Cone Park and Bivens Arm Nature Park

Project Description:

This project consisted of construction of sidewalk improvements to multiple city parks including Possum Creek, Fred Cone Park and Bivens Arm Nature Park. The work spanned from March 2024 to June 2024. Walker Masonry & Concrete, LLC performed the work at Fred Cone Park for $34,672, Possum Creek Park for $17,748.38 and Bivens Arm Nature Park for $9,343 for a total cost of $61,763.38. These projects includes the replacement of broken sidewalk, concrete grinding and addition of new sidewalk to improve park access. 

Cost: 

$61,763.38 (total)

Consultant/Contractor:

Walker Masonry & Concrete, LLC

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Morningside Nature Center New Cedar Shake Roof on Hogan's Cabin

Project Description:

This project consisted of the removal and replacement of the cedar shake roof and chimney of the 1840s-era Hogan's Cabin at Morningside Nature Center, located at 3540 E. University Ave. The replacement began in February 2024 and completed in April 2024. Atlantic Roofing & Exteriors, LLC, a small local business, performed the work for a project cost of $79,020.

Cost: 

$79,020

Consultant/Contractor:

Atlantic Roofing & Exteriors, LLC 

Morningside Nature Center Schoolhouse Deck Replacement

Project Description:

This project consisted of the removal and replacement of the deck and ramp to the schoolhouse building at Morningside Nature Center, located at 3540 E. University Ave. The replacement began in late September 2024 and completed in March 2024. Green’s Home Improvement, LLC, a small local business, performed the work for a project cost of $19,524.26.

Cost: 

$19,524.26

Consultant/Contractor:

Green's Home Improvement, LLC 

Bo Diddley Plaza Vewing Area Improvements

Project Description: 

With the goal of improving accessibility, this project consisted of the reconstruction of one of the brick viewing areas at Bo Diddley Plaza, located at 111 E University Ave. The work began in January 2024 and completed in February 2024. TPF Construction Services, LLC performed the work for a project cost of $31,867.50. 

Cost: 

$31,867.50

Consultant/Contractor: 

TPF Construction Services, LLC

H. Spurgeon Cherry Pool Slide Renovation

Project Description:

The project consisted of renovation work to the H. Spurgeon Cherry Pool Slide, located at 1001 NW 31 Dr. Renovation work spanned from late June 2024 to March 2024. The project included the removal and replacement of some of the slide’s structural supports as well as refurbishment of the slide. Rain Drop Products, LLC performed the work at a project cost of $225,144.00.

Cost: 

$225,144

Consultant/Contractor:

Rain Drop Products, LLC

ADA Improvement Projects: Albert "Ray" Massey Park and Lincoln Park

Project Description:

This project consisted of the construction of sidewalk improvements at Albert “Ray” Massey Park and Lincoln Park. Construction began in July and completed in October. Construction Genes, LLC performed the work at Albert “Ray” Massey Park for $23,050.00 and at Lincoln Park at a cost of $12,201.20. The improvements included replacing broken sidewalk, concrete grinding and adding new sidewalk to improve park access.

Cost:

$35,251.20 (total)

Consultant/Contractor:

Construction Genes, LLC

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

 

2023

Tom Petty Park Ball Field Improvements

Project Description:

This project consisted of multiple improvements to the fields at Tom Petty Park, located at 501 NE 16th Ave. The work lasted from mid-April and completed in early December 2023. The improvements included construction of an accessible pathway to all three softball fields, drainage improvements, new turf on softball fields and new shade structures installed over the bleachers and fencing upgrades. The project also included the installation of new scoreboards, water lines, water fountains and benches. Andrews Paving, Inc. performed the work at a project cost of $747,000.

Cost:

$747,000

Consultant/Contractor: 

Andrews Paving, Inc.

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Bo Diddley Plaza Stage Reconstruction

Project Description:

This project consisted of the reconstruction of the stage at Bo Diddley Plaza, located at 111 E University Ave. With work spanning from late November and wrapping up in early December 2023, the reconstruction improved drainage and functionality. Advance Industrial Coatings, LLC performed the work for a project cost of $30,105.10.

Cost: 

$30,105.10

Consultant/Contractor:

Advance Industrial Coatings, LLC

Forest Park (Abby Wambach Park) Improvements

Project Description:

This project consisted of major renovations at Forest Park (renamed Abby Wambach Park in 2024), located at 4501 SW 20th Ave. The renovations began in February and completed on Sept. 23, 2023. The improvements to the existing soccer fields included improved field drainage, field lighting, addition of a two-thirds-sized soccer field, turf replacement, irrigation modifications, 12 new shade structures and 30 new bleachers. Additional improvements to the park included pickleball and basketball court surfacing, the creation of small and large off-leash dog parks with amenities, a new pavilion, two competition-quality sand volleyball courts, parking lot lighting, and seven water fountains equipped with water bottle fillers. 

Blackwater Construction Services, LLC, a small, local business, served as the general contractor for the project for a cost of $2,666,877. NGU Sports Lighting, LLC provided the sports lighting for the park for a cost of $890,000. To support the renovation of the park, the Florida Legislature awarded Gainesville’s Wild Spaces & Public Places program a $200,000 Florida Recreation Development Assistance Program (FRDAP) matching grant.

Cost:

$3,556,877 (total)

Consultant/Contractor: 

  • Blackwater Construction Services, LLC
  • NGU Sports Lighting, LLC

Photos:

View Project Photos

Hippodrome Cinema Renovation and Restroom Remodel

Project Description:

This project consisted of renovation of the cinema and remodeling of the restrooms at the Hippodrome Theatre, located at 25 SE 2nd Place. Specifically, the project included a wholesale renovation of the cinema will new theatre seats, new light fixtures, new paint, carpet, a new movie screen and acoustic wall panels. The project also included upgrades to the first and second floor restrooms. Renovations began in early May 2023 and completed in August 2023. Joyner Construction, Inc. performed the work for a cost of $337,570. 

Cost: 

$337,570

Consultant/Contractor:

Joyner Construction, Inc.

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Morningside Nature Center Improvements

Project Description:

This project consisted of multiple improvements to Morningside Nature Center that took place in 2023. The improvements included the addition a new drinking fountain along the path to the Living History Farm, the installation of new electrical receptables and lights inside the barn, installation of a new cedar shake roof on the garden shed and installation of a new metal roof on the barn. The project cost totaled $27,795. 

Cost: 

$27,795 (total)

Consultant/Contractor:

  • American Roofing, Inc.
  • Sunshine Plumbing and Gas, LLC
  • Bolt Electric Contractors, Inc.

Albert "Ray" Massey Park Playground

Project Description:

This project consisted of the construction of a space-themed playground at Albert "Ray" Massey Park, located at 1001 NW 34th Street. The new playground offers a wide variety of physical, social and sensory play experiences for children of all ages and abilities. The fully-fenced playground features accessible play surfacing and a colorful theme to boost imaginative play. Scherer Construction of North Florida, LLC served as the general contractor for the project. Construction spanned from August 2022 to March 2023 and cost approximately $2,024,824.37. 

Cost: 

$2,024,824.37

Consultant/Contractor:

Scherer Construction of North Florida, LLC

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Unity Park Restroom

Project Description:

This project consisted of the construction of a restroom at Unity Park, located at 1700 NE 31st Ave. Construction spanned from December 2022 to August 2023. AKEA, Inc., a local minority and service-disabled veteran-owned firm, served as the general contractor for the project for a total project cost of $229,680. 

Cost: 

$229,680

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

H. Spurgeon Cherry Pool

Project Description: 

This project consisted of the major renovation of the H. Spurgeon Cherry Pool and associated 50-year old building located at Albert "Ray" Massey Park. The improvements included a new roofing system, new showers, restroom fixtures, lockers, benches, interior finishes and light fixtures, reconstruction of the parking lot, new fencing and new wind screens. Blackwater Construction Services, LLC, a local business, served as the general contractor for the project. Construction spanned from January 2022 to May 2023 with a final construction project cost of $1,678,294. 

Cost: 

$1,678,294

Consultant/Contractor:

Blackwater Construction Services, LLC

Photos:

View Project Photos

Possum Creek Skate Park Lighting

Project Description: 

This project consisted of the installation of new lighting to Possum Creek Park, located at 4009 NW 53rd Ave. Specifically, the project included lighting the skate park, parking lot and path to the restroom building. Musco Sports Lighting, LLC managed the work in coordination with Vintage Electric, Inc. and M. Gay Constructors, Inc. Installation spanned from March 2023 to July 2023 for a total cost of $156,663.88. 

Cost: 

$156,663.88

Consultant/Contractor:

  • Musco Sports Lighting, LLC
  • Vintage Electric, Inc.
  • M. Gay Constructors, Inc.

Communications:

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

A.N.N.E. Park Accessibility Improvements

Project Description:

This project consisted multiple improvements to A.N.N.E Park including the construction of an accessible pathway throughout the park, installation of an instrument play area, a new pavilion roof, new trash and recycling receptacles and a new swing set. City staff performed the construction work for the project from March 2023 to July 2023 for a total cost of $54,504. 

Cost: 

$54,504

Consultant/Contractor:

Construction was performed in-house by city staff.

Photos: 

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Dreamers Garden New Masonry Entry Columns and Gate

Project Description:

This project consisted of the installation of a new decorative 60-inch-wide metal arch and gate to Dreamer's Garden, located at 920 NW 4th St. J.A.M. Construction, Inc., a small local business, performed the work for a cost of $8,600. The work spanned from October 2023 to November 2023. 

Cost:

$8,600

Consultant/Contractor:

J.A.M. Construction, Inc. 

 

2022

Sweetwater Wetlands Park Gates

Project Description:

This project consisted of the installation of new gates and a new electric gate operator at the entrance to Sweetwater Wetlands Park in November 2022. Gainesville Ironworks, Inc. performed the work for a total cost of $14,675.

Cost: 

$14,675

Consultant/Contractor:

Gainesville Ironworks, Inc. 

Contact:

Cully Lord, Project Manager
(352) 393-8437
lordcw@gainesvillefl.gov

Clarence R. Kelly Community Center Mural

Project Description: 

As a part of the City of Gainesville Parks, Recreation and Cultural Affairs Department’s 352walls initiative, Haitian American artist Mwanel Pierre-Louis, AKA One L, created a mural at the front entrance of the community center, paying tribute to Clarence R. Kelly who passed away in 2011 at the age of 56. Kelly was the director of the then Northeast Recreation Center for 35 years. The center was renamed in his honor after his death. The project cost was $9,000. 

Cost: 

$9,000

Photos:

View Project Photos

Clarence R. Kelly Community Center and Park

Project Description: 

A fence was installed around the stormwater pond at Clarence R. Kelly Park in July. The work was performed by Hercules Fence Company, Inc. and the construction project cost was $9,850. 

Installation of lighting at Clarence R. Kelly Park, located at 1701 NE 8th Avenue, began in late August and completed in September. The new lighting allows basketball players to enjoy the park’s basketball court until 10 p.m. Bolt Electric Contractors, Inc., a local small business, served as the contractor for the project. The construction project cost was $17,711.

Construction of the new Clarence R. Kelly Community Center and Park, completed in May of 2022. Improvements included the construction of a new 3,800 SF community center and neighborhood park. The park features a new playground, adult fitness equipment, a full-sized lighted basketball court, a fenced community garden and much more. Blackwater Construction Services, LLC, a local business, was the general contractor for the project. The construction project cost was $2,292,276. 

Cost: 

$2,319,837 (total)

Consultant/Contractor:

  • Hercules Fence Company, Inc.
  • Bolt Electric Contractors, Inc.
  • Blackwater Construction Services, LLC

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Tom Petty Park Tennis and Pickleball Court Reconstruction

Project Description:

This project consisted of the reconstruction of four tennis courts at Tom Petty Park, located at 400 NE 16th Ave. The courts were originally constructed in the 1970s and required a complete rebuild. The reconstruction began May 12, 2022 and completed in early October 2022. Nidy Sports Construction Company, Inc. performed the work for a project cost of $158,245. 

Cost: 

$158,245

Consultant/Contractor: 

Nidy Sports Construction Company, Inc.

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Northside Park Tennis and Pickleball Court Surface Repairs

Project Description: 

This project consisted of improvements to the tennis and pickleball courts at Northside Park. Construction began in July and completed in early August. Nidy Sports Construction Company, Inc. performed the work for a project cost of $23,464. 

Cost:

$23,464

Consultant/Contractor:

Nidy Sports Construction Company, Inc. 

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Tom Petty Park Accessibility Improvements

Project Description:

This project consisted of accessibility improvements to the playground path at Tom Petty Park. Work began in mid-June 2022 and completed in July 2022. The City of Gainesville's Public Works Department performed the work at a project cost of $2,600.

Cost:

$2,600

Consultant/Contractor:

The City of Gainesville's in-house staff completed the project work. 

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Sweetwater Wetlands Park Electric Vehicles Storage and Charging

Project Description:

The project consisted of the construction of a garage at Sweetwater Wetlands Park to house two future electric vehicles. One of the electric vehicles will be used for tours while the other will help staff complete maintenance operations. M&M Masonry, LLC poured the concrete pad, Shed Ranch, Inc. erected the metal garage and Bolt Electric, LLC provided electric service to the new building. Complete in May 2022, the project cost a total of $71,505, inclusive of the two electric vehicles. 

Cost: 

$71,505 (total)

Consultant/Contractor:

  • M&M Masonry, LLC
  • Shed Ranch, Inc.
  • Bolt Electric, LLC

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

San Felasco Park Pétanque Court Improvements

Project Description:

The project consisted of the construction of pétanque courts at San Felasco Park completed in April 2022. The work was performed by Magnolia Landscaping, LLC and the construction cost was $17,928.

Cost: 

$17,928

Consultant/Contractor:

Magnolia Landscaping, LLC

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Fred Cone Park Fence by Bleachers

Project Description:

This project consisted of the installation of a fence between the bleachers and the track at Fred Cone Park in April. R & B Fencing, Inc. performed the work for a construction project cost of $14,000.

Cost:

$14,000

Consultant/Contractor:

R & B Fencing, Inc.

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Northside Park Court Lighting Improvements

Project Description: 

This project consisted of the installation of two new light poles and additional court lights at Northside Park to better illuminate the pickleball and tennis courts. NGU Sports Lighting, LLC completed the work in April for a construction project cost of $63,500. 

Cost:

$63,500

Consultant/Contractor:

NGU Sports Lighting, LLC

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Ironwood Golf Course Cart Path Reconstruction

Project Description:

This project consisted of the reconstruction work to portions of the Ironwood Golf Course concrete cart path which was completed in January 2022. Shine & Company, Inc. performed the work for a construction project cost of $181,500.

Cost:

$181,500

Consultant/Contractor:

Shine & Company, Inc.

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Loblolly Woods Park and Boardwalk Reconstruction

Project Description:

This project consisted of the reconstruction of the boardwalk at Loblolly Woods Nature Park, spanning from NW 8th Ave. approximately 1,400 feet north, which completed in January 2022. IMS Contracting, Inc. performed the work at a construction project cost of $420,187. 

Cost: 

$420,187

Consultant/Contractor:

IMS Contracting, Inc.

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

 

2021

Sweetwater Wetlands Park Porous Concrete Trail

Project Description:

This project consisted of the construction of a porous concrete trail at Sweetwater Wetlands Park. Construction began Nov. 29, 2021 and completed Dec. 28 2021. Specifically, the improvements included construction of a paved path from the park's entrance to Cell 1. American Construction Services, Inc. served as the general contractor with a construction project cost of $218,227. 

Cost:

$218,227

Consultant/Contractor:

American Construction Services, Inc.

Howard Bishop Recreation Area Renovations

Photo Album

1901 NE 9th St.

Project Description:

In partnership with the School Board of Alachua County, this project consisted of renovations to the track and tennis/basketball courts at Howard Bishop Middle School, located at 1901 NE 9th St. The project started construction in June 2021 and completed in November 2021. D.E. Scorpio Corporation, a local business, served as the general contractor for the project. The Wild Spaces & Public Places portion of the project was $250,000. 

Cost: 

$250,000

Consultant/Contractor:

D.E. Scorpio Corporation

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Albert "Ray" Massey Park Retaining Wall Improvements

Project Description:

This project consisted of the construction of a new retaining wall by the baseball scorer's box, between Fields 1 and 2, at Albert "Ray" Massey Park. The project began May 2021 and completed in October 2021. Elevated Design & Construction, LLC, a small, local and minority-owned business, served as the general contractor at a construction project cost of $31,700. 

Cost:

$31,700

Consultant/Contractor:

Elevated Design & Construction, LLC

Unity Park and Flatwoods Conservation Area Trailhead Improvements

Project Description:  

This project consisted of various improvements to Unity Park, a new neighborhood park, located at 1700 NE 31st Ave. The project began in August 2020 and completed in fall 2021. The improvements included two new basketball courts, a community garden, playground equipment, sidewalk games, a pavilion, grill and a walking loop with fitness stations. The Flatwoods Conservation Area Trailhead, located nearby at 2010 NE 31st Ave., also received upgrades that included parking lot improvements, a new kiosk, a trash and recycling container and bike racks.

The approximate project cost was $1,081,038. AKEA, Inc., a local, minority, certified service-disabled veteran-owned small business, served as the general contractor for the project. 

Cost: 

$1,081,038

Consultant/Contractor:

AKEA, Inc.

Photos:

View Project Photos

Dwight H. Hunter Pool Women's Locker Room Improvements

Project Description:

This project consisted of the renovation of the women's locker room at Dwight H. Hunter Pool located at 1100 Northeast 14th St. The project was completed in September 2021. Bolt Electric Contractors, Inc. installed new lights and McLeod General Trades installed new restroom partitions. The construction project cost was approximately $11,721. 

Cost:

$11,721

Consultant/Contractor:

  • Bolt Electric Contractors, Inc.
  • McLeod General Trades

Cedar Grove Park Playground Improvements

Project Description:

This project consisted of the renovation to the playground at Cedar Grove Park, located at 1201 NE 22nd St. The project was completed in April 2021. Miracle Recreation Equipment Company performed the work at a cost of $16,018. 

Cost:

$16,018

Consultant/Contractor:

Miracle Recreation Equipment Company

Dwight H. Hunter Pool Men's Locker Room Renovations

Project Description:  

This project consisted of the renovation of the men's locker room at Dwight H. Hunter Pool, located at 1100 NE 14th St. As part of the renovation, the locker room received new privacy partitions in the bathroom area, upgraded LED lighting and wall-mounted mirrors. Elevated Design & Construction, LLC performed the work for a project cost of $19,675 and completed the work in April 2021. 

Cost: 

$19,675

Consultant/Contractor:

Elevated Design & Construction, LLC

H. Spurgeon Cherry Pool Sun Shades

Project Description:

This project consisted of the installation of four 20 feet by 30 feet shade structures at H. Spurgeon Cherry Pool, located at 1001 NW 31st Drive. Creative Shade Solutions installed the shade structures for a project cost of $30,300 and completed the work in March 2021. 

Cost: 

$30,300

Consultant/Contractor:

Creative Shade Solutions

 

2020

T.B. McPherson Recreation Complex Pavilion Roof Replacements

Project Description: 

This project consisted of the replacement of the pavilion roofs at the T.B. McPherson Recreation Complex, located at 1717 SE 15th St. Advanced Roofing, Inc. completed the work in January 2021 at a project cost of $17,888. 

Cost: 

$17,888

Consultant/Contractor:

Advanced Roofing, Inc.

Photos:

View Project Photos

Splash Pads: H. Spurgeon Cherry and Dwight H. Hunter Pools

Project Description:

This project consisted of improvements to the splashpads at H. Spurgeon Cherry Pool, located at 1001 NW 31st Drive, and Dwight H. Hunter Pool, located at 1100 NE 14th St. The splash pads at both pools received complete overhauls which included new water features and refurbishment of the most popular existing amenities. Bliss Products and Services, Inc. completed the work at a project cost of $133,863 and completed the improvements in December 2020. 

Cost: 

$133,863 (combined total)

Consultant/Contractor:

Bliss Products and Services, Inc.

Photos:

View Project Photos

A. Quinn Jones Museum & Cultural Center Improvements

Project Description: 

This project consisted of improvements to the A. Quinn Jones Museum and Cultural Center, located at 1013 NW 7th Ave. Completed in late 2020, the improvements included the creation of a stormwater management system beneath the newly paved parking lot, a brick paver courtyard near the rear of the building with new seating, a storage shed, bike racks, landscaping and site lighting. One Day Came, Inc. served as the Construction Manager at a project cost of $313,000. 

Cost: 

$313,000

Consultant/Contractor:

One Day Came, Inc.

Photos:

View Project Photos

Albert “Ray” Massey Park Improvements

Project Description:

This project consisted of improvements to Albert "Ray" Massey Park, located at 1001 NW 34th St. Completed in November 2020, the project included various improvements to Field 1 and 2 of the park's baseball fields: field regrading, new "performance" turf, reconstruction of the scorer's platform ramp, a new ADA-accessible viewing area over Field 1 and erosion stabilization measures. As part of the project, the southernmost parking lot entrance was permanently closed to minimize vehicular traffic adjacent to the children's playground and reduce congestion along with the associated safety concerns at the NW 8th Ave. intersection. Additionally, the parking lot was reconfigured to provide 20 new parking spaces, triple the number of ADA spaces and dedicated bus, scooter and motorcycle parking. The overall project cost was $810,449. Hicks Asphalt Paving & Concrete Company, a small, local vendor served as the general contractor for the project. 

Cost:

$810,449

Consultant/Contractor:

Hicks Asphalt Paving & Concrete Company

Photos:

View Project Photos

Northside Park Improvements

Project Description:

This project consisted of renovations to Northside Park, located at 5701 NW 34th Blvd. Completed in 2020, the improvements included the addition of 40 parking spaces, a new playground and construction of the "Generations Play Zone", a new multi-generational play area. This zone is designed to provide activities for all ages and includes outdoor games such as bocce ball, pickleball and tennis courts, pétanque, table tennis, checkers and chess. The project also included construction of an outdoor patio, large pavilions with grills, shaded seating, viewing areas and a walking path with outdoor exercise equipment. The project cost totaled $2,145,524. Scherer Construction of North Florida facilitated the work. 

Cost: 

$2,145,524

Consultant/Contractor:

Scherer Construction of North Florida

Video:

View Project Video 

Additional Information:

Please view the link below for additional information about the project.

Additional Project Information

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Sharmie Ffar and Wilhelmina Johnson Cultural Center New Fencing

Project Description:

This project consists of the construction of a new wooden fence on the east property line of Sharmie Ffar Park. Completed in September 2020, the fence separates the park play areas from the adjacent neighborhood and provides a visual screen for the community from the playground and NW 10th St. The fence was installed by the City of Gainesville's in-house park operations staff at a cost of $1,500. 

Cost: 

$1,500

Consultant/Contractor:

This project was completed in-house by park operations staff.

Oakview Park Improvements

Project Description:

This project consisted of improvements to Oakview Park (formerly named Kiwanis Girl Scout Park), located at 810 NW 8th Ave. Completed in September 2020, the improvements included building renovations, a new modern playground, landscaping, parking and removing invasive species.  J.E. Decker Construction Group, LLC served as the construction manager for the project. The total project cost was $998,000. 

Cost:

$998,000

Consultant/Contractor:

J.E. Decker Construction Group, LLC

Video:

View Project Video

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Nature Center at Hogtown Creek Headwaters Nature Park

Project Description:

This project consisted of renovations to the circa-1890 farm house at Hogtown Creek Headwaters Nature Park to create a nature center. Completed in September 2020, the project totaled $478,000. J.E. Decker Construction Group, LLC was the general contractor who facilitated the work. 

Cost:

$478,000

Consultant/Contractor:

J.E. Decker Construction Group, LLC

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Hippodrome Theatre Improvements

Project Description:

This project consisted of various improvements to the Hippodrome Theatre, located at 25 SE 2nd Place, from 2018 to 2020: 

  • First and Second Floor Lobbies: New flooring, doors and door frames, wood trim, countertops, paint, new lighting and fixtures and restoration and relocation of existing historic light fixtures. Cost: $196,562
  • Exterior Lighting: Replacement and upgrades to exterior and front porch LED lighting. Cost: $49,872
  • Building Exterior: Replacement of the box office window, an exterior steel door and repair to the building’s gutter lining. Cost: $9,364
  • Interior Lighting: New office, general and theatrical lighting for the first and second floor. Cost: $32,440
  • Accessibility Improvements: New ADA assistive listening systems for the main stage and cinema. New stair nosing for the auditorium and upgraded second floor handrails. Cost: $9,603
  • Air Conditioning: Replacement of units on the first floor and basement green room, and first-time installation of an air conditioning system in the scene shop. Cost: $21,627
  • Speaker System: New speaker system for the second floor. Cost: $4,910

Joyner Construction Partners, LLC served as the general contractor for the project. 

Cost: 

$324,378 (combined total)

Consultant/Contractor:

Joyner Construction Partners, LLC 

Photos and Video:

View Project Photos
View Virtual Video Tour

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Depot Park Improvements

Project Description: 

This project consisted of electrical improvements to Depot Park, located at 874 SE 4th St. Completed in August 2020, the work included the addition of bollard lighting from the Depot Park parking lot to the old Regional Transfer System (RTS) parking lot. The project also included a large electrical capacity upgrade to the park. Existing light poles were retrofitted with electrical outlets and additional 30 and 50-amp outlets were strategically placed in the Little Lawns, the West Overlook, the East Overlook, and the Open Lawn to better accommodate events and programming at the park. The total project cost was $456,991. Oelrich Construction, Inc. served as the general contractor for the project. 

Cost:

$456,991

Consultant/Contractor:

Oelrich Construction, Inc.

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

San Felasco Park Improvements

Project Description:

This project consisted of the installation of a new play structure at San Felasco Park, located at 6400 NW 43rd Way. The new play structure is geared toward children aged 5-12 years old. Landscape Structures, Inc. completed the installation in July 2020 for a total project cost of $28,915.

Cost:

$28,915

Consultant/Contractor:

Landscape Structures, Inc.

Photos:

View Project Photos

Springtree Park Improvements

Project Description:

This project consisted of various improvements to Springtree Park, located at 2700 NW 39th Ave. Completed in July 2020, the project included improvement of trails and park access, a new playground, adult fitness stations, a deck overlooking Three Lakes Creek, a pavilion and park signage. Bliss Products and Services, Inc. constructed the improvements at a total construction cost of $197,609. 

Cost:

$197,609

Consultant/Contractor:

Bliss Products and Services, Inc. 

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Morningside Nature Center Improvements

Project Description:

This project consisted of the construction of new Timucuan Indian living historical exhibits at Morningside Nature Center, located at 3540 E University Ave. The structures were built on June 16 and 17, 2020 by Big Kahuna Tiki Huts, Inc. in partnership with the Seminole Indian Tribe. The structures were built using hand-hewn cypress poles and freshly harvested cabbage palm fronds from the Florida Everglades. The project totaled $29,885. 

Cost:

$29,885

Consultant/Contractor:

Big Kahuna Tiki Huts, Inc. in partnership with the Seminole Indian Tribe

Photos:

View Project Photos

Wilhelmina Johnson Resource Center and Sharmie Ffar Park Improvements

Project Description:

This project consisted of the construction of a large pavilion with tables and an accessible path at Sharmie Ffar Park, located at 321 NW 10th St. The project wrapped up in June 2020 and Bliss Products and Services, Inc. served as the contractor for a total project cost of $43,842. 

Cost: 

$43,842

Consultant/Contractor:

Bliss Products and Services, Inc.

Photos:

View Project Photos

Tom Petty Park Improvements

Project Description:

This project consisted of the installation of an irrigation well for the softball fields at Tom Petty Park, located at 400 NE 16th Ave. Clyatt Well Drilling, Inc. performed the work for a total cost of $18,995. The project wrapped up in June 2020.

Cost: 

$18,995

Consultant/Contractor:

Clyatt Well Drilling, Inc.

Bo Diddley Plaza Improvements

Project Description:

This project consisted of the installation of a new bike repair station and air pump on the east side of Bo Diddley Plaza, located at 111 E University Ave. Additional bike racks that can accommodate up to 32 bikes were also installed throughout the plaza. The improvements cost $6,600 and the work was completed by the City of Gainesville's park operations staff in collaboration with the Public Works Department operations personnel. The work took place from March to April 2020. 

Cost:

$6,600

Consultant/Contractor:

The work for this project was completed by in-house staff. 

Photos:

View Project Photos

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov 

T.B. McPherson Recreation Complex Tennis Court Improvements

Project Description:

This project consisted of the wholesale renovation of the tennis courts at T.B. McPherson Park, located at 1717 SE 15th St. Completed in March 2020, the project included the demolition of the existing tennis courts, construction of new courts and installation of new nets, posts, perimeter fencing and windscreens. Nidy Sports Construction Co. performed the work for a total construction cost of $173,407. 

Cost:

$173,407

Consultant/Contractor: 

Nidy Sports Construction Co.

Photos:

View Project Photos

Northside Park Disc Golf Bridge Work

Project Description: 

This project consisted of improvements to the disc golf bridge, between Hole 6 and 7, at Northside Park, located at 5701 NW 34th Blvd. EMC Framing, LLC completed the work for the project in March 2020. The project cost was $9,500. 

Cost:

$9,500

Consultant/Contractor:

EMC Framing, LLC

Photos:

View Project Photos

Lincoln-Williams Drainage Improvements

Project Description:

This project consisted of drainage improvements to the fields between Abraham Lincoln Middle School and Joseph Williams Elementary School, located at 1001 SE 12th St. Completed in February 2020, the project improved field conditions after heavy rainfall and allows for greater recreational use. 

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Bo Diddley Plaza Improvements

Project Description: 

This project consisted of accessibility improvements to Bo Diddley Plaza, located at 111 E University Ave. Completed in early 2020, the project included the replacement of existing uneven brick surfaces as well as additional brickwork. Charles Perry Partners, Inc. served as the contractor for the project. The project cost was $130,000. 

Cost: 

$130,000

Consultant/Contractor:

Charles Perry Partners, Inc.

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Boulware Springs Park Improvements

Project Description:

This project consisted of the installation of a new metal roof at the Boulware Springs Park pavilion, located at 3300 SE 15th St. American Roofing Company, a small, local business, served as the contractor for the installation. The project completed work in January 2020 and cost a total of $5,495. 

Cost:

$5,495

Consultant/Contractor:

American Roofing Company

Photos:

View Project Photos

Reserve Park

Project Description:

This project consisted of the construction of a new neighborhood park, Reserve Park, located at 700 NE 11th St. Completed in January 2020, the new park includes a modern playground, a community garden, traveling rings, an obstacle course, picnic areas and a memorial to reserve soldiers. Anglin Construction Company served as the general contractor for the project at a total construction cost of $922,807. 

Cost:

$922,807

Consultant/Contractor:

Anglin Construction Company

Photos:

View Project Photos

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov 

 

2019

Fred Cone Park Turf and Drainage Improvements

Project Description:

This project consisted of drainage and turf improvements to Fred Cone Park, located at 2841 E University Ave. The project completed in 2019 and the field reopened to the public. Before this project, the field would hold water after significant rain events, making it unplayable for multiple days. Foresight Construction Group, Inc. oversaw the work with construction being facilitated by ZORRN Company, Inc. 

Consultant/Contractor:

  • Foresight Construction Group, Inc.
  • ZORRN Company, Inc.

Photos:

View Project Photos

SW 47th Ave Trail (SW 40th Blvd to SW 34th St)

Project Description:

This project consisted of the construction of a 1,619-foot paved multiuse trail on the north side of SW 47th Ave. from SW 40th Blvd. to SW 34th St. Construction began September 2018 and completed October 2019. Commercial Industrial Corp. constructed the trail which connects high-density residential areas to activity centers off SW 34th St. The project cost was $629,888. 

Cost:

$629,888

Consultant/Contractor:

Commercial Industrial Corp.

Photos:

View Project Photos

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov 

Carolyn Beatrice Parker Park (formerly J.J. Finley Park)

Project Description:

This project consisted of the construction of Carolyn Beatrice Parker Park, a new neighborhood park located at 1912 NW 5th Ave. Completed in August 2019, the project was constructed in partnership with the School Board of Alachua County. The improvements included a new playground with outdoor musical instruments, climbing features, picnic tables, benches, trash and recycling containers, striped basketball courts and goals and painting of the covered pavilion. Decorative fencing was installed to prevent access to school buildings during non-school hours. Bliss Products and Services, Inc. served as the contractor for the project. The project cost was $268,579.

Cost:

$268,579

Consultant/Contractor:

Bliss Products and Services, Inc. 

Photos:

View Project Photos

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov 

Duval Park Boardwalk Replacement

Project Description:

This project consisted of the replacement of the boardwalk at Duval Park, located at 520 NE 21st St. Completed in August 2019, the project involved the replacement of the wooden boardwalk which makes up a half mile of the walking loop within the park. AKEA, Inc. oversaw the work and Diversified Professional Service Corporation constructed the project. The project cost was $476,226. 

Cost:

$476,226

Consultant/Contractor:

  • AKEA, Inc.
  • Diversified Professional Service Corporation

Photos:

View Project Photos

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov 

Lincoln Park Improvements

Project Description:

This project consisted of a series of improvements to Lincoln Park, located at 924 SE 15th St. Completed in summer 2019, the project work included new concrete pads for new bleachers and dugouts, a 10-foot homerun fence, new sidewalks, a new scoreboard and a new water bottle filler at the park's restroom building. The project cost was $85,127.

Cost:

$85,127

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Ironwood Golf Course Improvements

Project Description:

This project consisted of the installation of lighting at the Ironwood Golf Course driving range, located at 2100 NE 39th Ave. The installation enabled the utilization of the driving range by golf patrons for extended hours. Completed in April 2019, the project cost was $99,500. 

Cost:

$99,500

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Depot Park Improvements

Project Description:

This project consisted of the addition of a trail connection between the former Regional Transit System (RTS) parking lot and the trail on the east side of Depot Park, located at 874 SE 4th St. Construction began December 2019 and completed at the end of 2019. Oelrich Construction, Inc. oversaw the project for a total construction cost of $39,415. 

Cost:

$39,415

Consultant/Contractor:

Oelrich Construction, Inc.

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Morningside Nature Center

Project Description: 

 
Morningside Nature Center welcomed Zinnia, a Jersey Calf, to the farm in December of 2019.  Zinnia has a vibrant personality and she looks forward to meeting you. The project cost was $900.

Cost:

$900

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Fred Cone Park Improvements - Shade Structures

Project Description:

This project consisted of the installation of new shade structures over the bleachers at Fred Cone Park, located at 2841 E. University Ave. Installed in June 2019, the new canopy offers shaded seating for sports spectators and spans the full length of the bleachers, which can accommodate up to 360 people. USA Shade Fabric Structures served as the contractor and the project cost was $75,275. 

Cost:

$75,275

Consultant/Contractor:

USA Shade Fabric Structures

Photos:

View Project Photos 

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Green Acres Park

Project Description:

This project consisted of improvements to Green Acres Park, located at 643 SW 40th St. Completed in May 2019, the improvements included a new playground, pavilion, picnic tables and benches, new adult outdoor fitness equipment and a sidewalk connecting all of the park amenities. 

Photos:

View Project Photos

Contact:

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov

Barbara Higgins Park

Project Description:

This project consisted of a clean-up day for Barbara Higgins Park, that took place on June 7, 2019, in partnership with Lowe's and Neighborhood Housing Development Corporation. The project involved the installation of a new benches, tables, a grill and fresh mulch for the playground. The project cost was $9,845. 

Cost:

$9,845

 

2018

Hippodrome Theatre Improvements

Project Description:

This project consisted of safety and efficiency upgrades to the Hippodrome Theatre, located at 25 SE 2nd Place. The improvements included the replacement of the emergency communication system, upgrading of the lighting to LED, replacement of the box office window, replacement of the second floor handrails and repair of the handicap ramp and exit tower railings. The project cost was $51,509.

Cost:

$51,509

A. Quinn Jones Museum Renovations

Project Description:

This project consisted of various renovations to the A. Quinn Jones Museum, located at 1108 NW 7th Ave. The improvements included the renovation of the exterior storage, installation of a security system on both buildings and fabrication of traveling and permanent exhibits. The project cost was $41,121. 

Cost:

$41,121

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov 

Thomas Center Building Renovations

Project Description:

This project consisted of renovations to the Thomas Center Building, located at 302 NE 6th Ave. The improvements included the replacement of indoor and outdoor lighting, repair of the Thomas Center fountain, installation of a bike rack and minor landscaping improvements. 

Contact: 

Sarit Sela, Project Manager
352-393-8207
selas@gainesvillefl.gov

Rosa B. Williams Center Renovations

Project Description: 

This project consisted of renovations to the Rosa B. Williams Center, located at 524 NW 1st St. The improvements included an interior renovation to include replacing the ceiling, doors and flooring, a signage update, storage expansion, and replacement of interior and exterior lighting. 

Ironwood Golf Course Improvements

Project Description:

This project consisted of improvements to Ironwood Golf Course, located at 2100 NE 39th Ave. The improvements included drainage improvements to the fairways, addition of equipment storage areas, installation of a new restroom on the front nine, resealing of the parking lot, cleaning of the course ditches and ponds, repair of the cart paths, replacement of banquet room furnishings, lighting and carpet upgrades. The project cost was $76,899. 

Cost: 

$76,899

Lincoln Park Improvements

Project Description: 

This project consisted of multiple improvements to Lincoln Park, located at 924 SE 15th St. The improvements included field grading and the installation of new bases, a home place and pitching rubber. Completed during the spring break week in 2018, the project was completed by city staff. 

View Project Photos

Shade Structures (Multiple Locations)

Project Description:

This project consisted of the installation of shade structures over playground equipment and other park amenities at ten parks in the City of Gainesville. The last shade structure installation wrapped up in February 2018. Shade structures were installed at the following parks and sites: 

  • T.B. McPherson Recreation Center’s Tennis Courts
  • Depot Park
  • Roper Park
  • Rosa B. Williams Center
  • Cofrin Nature Park
  • Martin Luther King Jr. Multipurpose Center
  • Cedar Grove Park
  • Fred Cone Park
  • Dwight H. Hunter (Northeast) Pool deck
  • Porters Community Center
  • T.B. McPherson Recreation Center

This project, in conjunction with the sunscreen dispenser installation throughout city parks, encourages safe play and provides comfort for all users. The project cost was $375,952.

Cost: 

$375,952

H. Spurgeon Westside Pool

Project Description:

This project consisted of the installation of geothermal heating and cooling pumps at the H. Spurgeon Westside Pool, located at 1001 NW 31st Dr. Completed in September 2018, the project installation in conjunction with solar blankets allow the pool to remain open all year long. The project cost was $329,448.

Contact: 

Betsy Waite, Project Manager
352-393-8187
waiteed@gainesvillefl.gov